Hale Boggs Federal Building and Courthouse Repair and Alteration

Hale Boggs Federal Building and Courthouse Repair and Alteration

Scope of Work:

  • Removal and replacement of horizontal cabling infrastructure
  • Installation of Category 6A or higher-rated cabling
  • Compliance with SCIF-specific security and shielding requirements
  • Integration with existing secure IT systems and network closets
  • Ensuring minimal disruption to ongoing SCIF operations during installation

This work was part of a broader modernization effort that included HVAC, electrical, and structural upgrades. The SCIF-related cabling replacement was particularly sensitive due to the classified nature of operations and the need to meet ICD/ICS 705 standards for secure facilities